The route progress analysis system is finally connected.
When the planned route changes to the status "In progress", the system begins to analyze the positions of the group members relative to the route thread and show % of the route along the track. This works even if there are small deviations from the track, self-intersections of the track and a deadlock with the return.
There is a new status for the route "Date change", suitable if for some reason you have to postpone your route
Date: 16.10.2021